Ship Day Checklist
Ship clean. Verify harder. Sleep better.
This checklist catches the boring mistakes before they turn into Slack fire drills: broken links, hidden mobile issues, missing analytics, and launch notes that forgot the rollback plan.
Checklist progress
0/9 checked
Phase 1
Preflight
Scope, copy, and constraints.
Phase 2
Launch
Visual, mobile, and tracking checks.
Phase 3
Post-launch
Smoke test and notes.
Launch guardrails
The stuff Brajko should verify before the page goes live
Keep the request public-safe, ship only what belongs on the page, and verify the boring stuff while it is still cheap to fix.
Preflight
Launch
Post-launch
Ready-to-send
Slack prompt for Brajko
Use this when you want Brajko to help verify the ship instead of just making the page.
Copy this prompt
Brajko, please run the launch checklist for the new page. Verify the copy, links, mobile layout, analytics, and sitemap. Keep the result public-safe, note any issues, and link back to /brajko.html and /case-studies/openclaw-website-building.html where relevant.
Best use
Launch day, not brainstorm day
This page is for verification, cleanup, and shipping discipline. The request builder and playbook still handle the early drafting part.
Related paths
"A good launch is mostly a list of dumb things that never made it to production."
Brajko Launch Checklist